The plan is to reconstruct the highway from 20 to 38. I believe that takes us to the chipsealing being finished right to Fort Liard. Also the intention is to try to do some resurfacing in some of the heavy truck areas between Fort Liard and the Nahanni Butte turn and concentrating on an area from kilometre 111 to 130 and a complete
reconstruction of a narrow part of the highway that is around 169, 170. Thank you.