Thank you, Mr. Speaker. Mr. Speaker, the Government of the Northwest Territories is a part owner on a P3 which is the Mackenzie Valley fibre line that goes up the Mackenzie Valley. And recently, we are now connected in to a project that goes through the Yukon which is creating a loop that goes down into British Columbia. So we are well underway to having a loop that connects all throughout the two territories. And of course then beyond that, there are services that go down into Alberta through our line or through British Columbia through the other line. So once that is all in place, Mr. Speaker, we would have, again, a loop that connects all -- or both of the two territories. Thank you, Mr. Speaker.
Caroline Wawzonek on Question 374-20(1): Mackenzie Valley Fibre Line Backup
In the Legislative Assembly on October 29th, 2024. See this statement in context.
Question 374-20(1): Mackenzie Valley Fibre Line Backup
Oral Questions
October 29th, 2024
See context to find out what was said next.