Mr. Chairman, I do have the document that the Member is referring to now. Non-competitive contracting includes sole-sourced contracting and
there are several criteria that have to be met before we go to this process. As pointed out in the criteria that the Member probably has, these need to be urgently required and if delay of the work being done would be harmful to the public interest and only if one party is available and capable of performing the contract. There is a criteria of how much is allowable.