Thank you, Mr. Chairman. Similarly, this program targets major culvert structures, not the normal small pipes that you see under the road for drainage purposes, but rather large structural pipes on the system.
Two projects are proposed which have been identified in our multi-year inventory replacement plan. Those projects are on Highway No. 1 at kilometre 514 and on Highway No. 1 at kilometre 525. Two large pipes, I believe they are three or four metre structures at the location that are multi-plate structural plates that are being replaced. These specific ones were identified together to optimize the economy. Actually, one site near another to replace. They were next on our needs base. Thank you, Mr. Chairman.