Thank you, Mr. Speaker. I am not familiar with the contract regulation requirements of this project. Although we were consistently trying to find methods of reducing the costs and reducing the facility, we found through the analysis that it was not possible. Therefore, we remained consistent with the chronology of decisions that led up to the conclusion of this facility. Thank you, Mr. Speaker.