Thank you, Mr. Chairman. Just a bit of the history on the Fort Smith technical assessment that was done in 1998 which identified significant problems with the building systems, and suggested that within five years if corrective action wasn't taken we'd have to abandon the building. Initially, attempts were made to deal with building systems as they failed. Several have failed in the interim. The boilers had to be replaced, the chiller had to be replaced, the roof is currently under repair and building envelope itself has failed.
The last two fiscal years we attempted to include the Fort Smith facility in the capital planning process. It didn't make the cut, and it was bumped, therefore, it didn't show up on the five-year plan. This year, given the nature and severity of the failures, mitigation efforts are not possible. We do have to do something in fairly short order or the building will have to be abandoned. So in this current year's planning process it was a high enough priority to remain in the capital plan. Thank you, Mr. Chairman.