Thank you, Mr. Speaker. Mr. Speaker, the structural engineer's report that we had received stated that with the loading on the second and third floor being removed, that the main floor would then be available for occupancy, and we're still working at how we can get that done. As well, the owner of the building has hired their own structural engineer and we're going to have to see what their report says before we make a final decision. Thank you.