Thank you, Mr. Speaker. Mr. Speaker, the Perry Building is a leased asset. It is not our own facility. When the initial problems were noted, there was some investigation into what was occurring. Some work happened around removing the stone roof that was there and applying a different roofing material to lighten the load. That was done. After that was done, we had more staff move into the building and noticed that there were some more cracks and issues happening there. At that point, a call was made to bring in a structural engineer to have a look. Thank you.