For the Member, the
issue of the bridge came up several times in terms of options to allow for a rail link: various options in terms of walking and different ways that this bridge could be constructed. At the end of the day it had to be based on the factor of pricing and what’s realistic. These options were screened out and not seen as an option, like the railway for the Deh Cho Bridge.