Thank you, Mr.
Chairman.
Mr. Chairman, I’m just curious about how much work is planned for this summer on Highway No. 3. I’ve been on the highway a fair bit. It needs almost warranty work, and it’s just barely finished. I’d be surprised if the paint on that road is dry yet. I mean, the heaving, or, as some field professionals would
describe it, the ice lensing, has caused some twists and turns.
I’m just wondering what work’s going to be done to repair that. It’s a shame that that highway, just completed, already needs work.