I think the big thing here is that we have to find a suitable location. I know for a fact they need about seven rooms. They operate on timetable schedules, so having classes in different locations throughout the community isn’t very much of an option.
Going back to the centre itself — I may have asked the Minister this before —was the engineer’s report done by DPW, or was that done by an independent engineer?