Mr. Speaker, one of the options that we did work with was PWS having another inspection done on the actual building itself. The building is an old building, so it was a safety factor. The foundation is rotting away. At the same time, that was one of the options we were working on.
The next option, in the medium term, will be to do a lease agreement with the college campus, because we know that the students need to enter the fall school year. That’s one of the short-term solutions that we are working on. After July 30 I do believe there will be space available for them. That’s one of the areas that we are focusing on as well. Mahsi.