Thank you, Mr.
Speaker. Mr. Speaker, the bridge project has to follow and abide by the Canadian Highway Bridge Code on all aspects of the project including design, and must also have the design pass a number of very rigorous tests and evaluations to ensure that the project meets that code. At the time of the
signing of the concession agreement, both the Deh Cho Bridge Corporation and the Government of the Northwest Territories had agreed to complete these detailed examinations. Those are currently being held and we will have the report, hopefully, sometime over the summer. Thank you.