When we entered into the contracts, we had a number of goals in mind as the Ottawa connection was the biggest one. Some
of our industry possibilities were some of the things we were talking about, like the Mackenzie Valley Highway, like our Hydro Strategy that the Government of the Northwest Territories has put in place. There are a couple of key issues that we wanted to build our business case with, that we wanted to set up our networks with. As the information shows to the Member that in fact the contract that he’s speaking specifically of, I believe that contract was terminated in September 2008 and hasn’t been renewed since that time because we felt we’d built up the network and connections and went forward on that basis.