Mr. Chairman, as we indicated earlier, we haven’t firmed up our work plan for the long term as we’re still waiting for some information and some testing that’s being done, and to get the engineering reports back. It would be fairly easy, I guess, to look at portions of the road that are reconstructed to chipseal, but I am a little
hesitant as there is so much need for this Highway No. 7 that if we did take some money out of the construction costs to chipseal, then, of course, that would leave us with a little less to do reconstruction. So that’s going to be determined. The reality, of course, is Highway No. 7 has to be reconstructed right from start, from zero all the way to Checkpoint and that’s going to be a long-term investment and we need a plan to do so. Thank you.