I raised the point and I noticed that the demolition went very well for the department. They had some good discussions.
Actually, a lot of people showed up, surprisingly to the contractor, just maybe because he thought there was going to be maybe a dozen people showing up to work. Actually it was just over 50 people that showed up and wanted to work. So it went very well. So I’d like to congratulate the department for being flexible and open to a good possibility. I believe that the same type of discussions now are happening in Fort Good Hope with the old Chief T’Selehye School and I hope things go well with them there. Is it possible for the department to provide me with a brief report as to these two demolition projects in my region, for my own curiosity, and use them for reference in case I get calls from constituents as to the work projects? Thank you.