Thank you, Madam Chair. In the ’11-12 fiscal year and previous to that we had spent $5.8 million. About $1.6 million of that would have come from the federal government and the rest was from the GNWT. That would have been starting with the preparation of the initial project description report and then going into the environmental assessment, doing economic analysis, beginning all the different studies required for the environmental assessment process. In the current fiscal year, in ’12-13, we have $3.5 million to date. The majority of that would be spent on the geotechnical program, about $2 million of that $3.5 million, and then to carry on through the environmental assessment process and complete all of the studies that are required as part of that process. We, as well, are working on designs, on preliminary engineering and on cost estimates.
Russ Neudorf on Consideration in Committee of the Whole of Bills and Other Matters
In the Legislative Assembly on October 30th, 2012. See this statement in context.
Consideration in Committee of the Whole of Bills and Other Matters
Consideration in Committee of the Whole of Bills and Other Matters
October 29th, 2012
Russ Neudorf
See context to find out what was said next.