Thank you. I’m glad to hear that the Minister is working on this. In terms of his mention of synthetic gas, it is an issue because the way we ship it up in Inuvik is from Dawson, and as we all know, the Dempster Highway does close down sometimes. Our storage for the synthetic gas is only a five-day storage and we don’t want to get into a situation during these cold winter months where we’ll find ourselves in dire straits here.
He did mention about four weeks to come back with the report and the study. Can he give me an exact timeline, whether it be after we finish this House sitting, so I can let the residents of Inuvik know that at the end of this session we should have something that might be implemented, something that we can look at and move further? Can he give me a specific timeline, if possible? Thank you.