Thank you. Sorry, I may have said Highway No. 7 earlier. Sorry. Freudian slip. Highway No. 4 bypass. Sorry to the Member.
I appreciate the Minister’s response here, but we know that the designs of bridges are very, very intricate. There’s a lot of engineering designs, it has to go through a flurry of testing before this bridge would be put on any type of abutments or any type of structure. From the sounds of it, it almost sounds like what the Minister tried to elaborate – and I may be wrong in assuming – that this thing almost went in backwards.
Now, if indeed I’m in error, I’d ask the Minister to correct me, but if it’s true, there is definitely… It sounds like extra costs to engineering, it sounds like there could have been extra costs for materials and possibly extra costs in general. With these extra costs and these delays, out of curiosity, were there any extra costs to the taxpayer? Can the Minister elaborate on that? Thank you.