Thank you, Madam Speaker. There was not a design issue; the issue was with the installation of the bridge. The bridge was installed and the panels that sit on top the bridge were not totally lined up with the installation of the sides of the bridge. It took some time to make the correction, so that has been corrected. There’s no issue with the safety of the bridge or anything. The corrections have been made and the bridge is now properly installed. Thank you.
Tom Beaulieu on Question 59-17(5): Highway No. 4 Realignment
In the Legislative Assembly on February 7th, 2014. See this statement in context.
See context to find out what was said next.