Mr. Speaker, when we are doing a midlife retrofit, such as what the plan is here, I understand that there was already a bit of a retrofit in Moose Kerr School. I believe that was in 2000. If we are referring to this after the 40 years, in 2019, there is a certain point under which we make a decision to replace the facility, if it exceeds a certain percent, if the renovation would exceed a certain percentage of cost of a totally brand new unit. When a retrofit can be brought in and the life of the facility can be extended to a reasonable time period, then that retrofit is done and everything can be replaced and the extension can be done lower than a certain percent of the cost of a new school. Thank you.