The requirement for granular material in Aklavik was 23,300 cubic metres of granular material, which was about 3,250 cubic metres for the GNWT and the balance of it being needed by the hamlet. So the hamlet had indicated that the projects they would like to run during the year and had indicated that they had sufficient granular material. If the hamlet is going to move some of the material, assuming that they had only that amount, that they don’t have a surplus, and they need to move off another project, I guess that’s a discussion that will occur with the hamlet locally.
We were advised that with the projects we were running, there is certainly sufficient granular material. So, hopefully there is enough to do all of the projects, plus the parking lot. That is our hope today, but I don’t have a very recent update as of today whether or not all of these projects, plus the parking lot, is what we have granular material for. Thank you.