Thank you, Mr. Chair. With regard to the new phone system, the current system is almost 30 years old and is very close to it its end of life. The current contract with the GNWT ends in the fall of 2016. So, we did the business case to look at our options, and it was determined that we could foresee increasing costs to replace phone sets and make changes of moving the phones around, et cetera. Those costs were only going to continue to increase.
The new system will run over the GNWT data network, and the hardware costs are dramatically reduced, the long-distance cost will be reduced. The system will be supported by the TSC, so we will be able to do those internal moves within our current staff. So, all of these contribute to an approximately $6 million savings over 10 years. Thank you, Mr. Chair.