The entire project is $11 million. With that, our intention is to survey
– and the
survey is commencing now
– and do some crushing
and producing material and strengthen the roadway. Then we intend to replace culverts where a lot of the culverts have sunk and collapsed. Also, at the end, once the road is built to a strength that we’re happy with, then we’re going to be chipsealing the road. We are going to wait for the Building Canada Plan before the actual construction begins.
Just with our relationship with Infrastructure Canada, we found that it’s better to wait and then they’re more apt to fund the whole project if we wait and start after they provide us approvals.