Thank you, Mr. Speaker. The average percentage was based on the stick-built price the Housing Corporation received as part of the public tender process, compared against the design build process, received for module homes that were awarded.
The NWT Housing Corporation is not permitted, under the Tendering and Contracting Rules to provide specific detailed information on each proposal, but we can say, that on average, the prices received for stick-built, was more than 30 per cent higher than the module prices. In some case, the per cent was actually much higher. Thank you, Mr. Speaker.