To address the bridge cost to start with, that would be a significant cost; I couldn't tell the Member exactly what that would be. We would have to take on a planning study and look into what the infrastructure would cost for that, and even if we did do that, that would be a significant amount of money as we know what the previous bridges in the Northwest Territories have cost. We'd have to go back to Infrastructure Canada to assist with that, and under the fiscal pressures that this government is seeing it's probably something that would have to be rolled out in a 20-year study of our needs of infrastructure.
Getting back to the increased storage capacity of the suppliers in the region, one of the things during the conversation that took place with a number of proponents up there was the Ikhil gas well has been used during these times as of recently, and this helps offset the need for LNG and propane at the same time. But that's why we're having this conversation early on, as this is proposed as a budget reduction coming up in the next budget cycle, is that we want the proponents to have the reserve appropriate in LNG as needed with what's needed with the short time that that ferry would be closed.I guess the one other point that I'd want to make about it that during the operation of the winter ferry; that the Dempster has been closed 40 per cent of the time so it only leaves about 20 some days at the max that that operation has been open.