Thank you, Mr. Speaker. As part of our bridge monitoring inspection regime, we've been closely monitoring the side slopes on the approaches and the embankment movements of the Deh Cho Bridge. Some longitudinal cracks have appeared and we've been observing them on the bridge approaches, and as a proactive and preventive measure of our ongoing part of our maintenance program, we're working to stabilize these approaches and embankments to stop future cracking of the longitudinal cracks that are appearing.
As to the contractor that's on-site, they are called GeoStabilization International. This was awarded, a contract, through public procurement through the Government of the Northwest Territories. Thank you, Mr. Speaker.