Thank you, Madam Chair. So we're looking at extending basically the line, the 72KB line from Hay River to Fort Providence. So of course as we go into design and if there's different needs, any surplus power of course could be used for other operations. We'll have to consider that is there going to be need to change the design a little bit? Is there going to be a need to upgrade substations, etcetera? So I guess I don't have a firm answer for you. It's something that we'd have to consider when we get closer to the ultimate design and construction of that project. Thank you, Madam Chair.