Mahsi, Mr. Speaker and mahsi to the Minister for that and her willingness to follow up with the LHO. She mentioned stick-built, but I was hearing otherwise. There was talk that these units will be sandwich panel construction with the panels being built by a Yellowknife company.
Has there been a cost benefit analysis or cost comparison to determine if this method has significant savings versus stick-built construction?