Thank you, Madam Speaker. Madam Speaker, that was our hope. We did look at some of the options on the routing. We're trying to connect the Whati to the North Slave hydro system, to go along the existing winter road roughly about the east -- to the west side to be able to connect to our current hydro facility directly. So I can get back to the Member in terms of timeline for when we will have it done. Thanks.
Diane Archie on Question 1296-19(2): Highway No. 3 Transmission Line
In the Legislative Assembly on November 3rd, 2022. See this statement in context.
Question 1296-19(2): Highway No. 3 Transmission Line
Oral Questions
November 3rd, 2022
Page 5063