Thank you, Mr. Speaker. We have experienced unprecedented water levels on multiple sections of our highways, Highway 1, Highway 2, Highway 3, and 5, all have been impacted.
On Highway 5, we've had a washout to the bridge approach at Preval Creek and closed the highway briefly to repair. On Highway 1, we saw high-water levels breaching the road surface in multiple areas. Kilometre 56, we reduced the highway to one lane, installed multiple pumps to move water to the other side of the highway. Kilometre 84, Escarpment Creek, CN were pumping water over the rail bed and it impacted our highway. We again pumped the water over the highway to be able to bring that water level down. At Kilometre 236 to 238, our road surface began to deteriorate, and we dug two trenches to reduce the water level and protect the integrity of the highway. We also experienced washout at this section and installed Bailey Bridge to allow us to reopen that highway. On the Kakisa access, we replaced a culvert and plan to install an additional culvert this year. Thank you, Mr. Speaker.