Thank you, Mr. Speaker. Mr. Speaker, achieving the 18-kilowatt -- kiloton, sorry, big difference here -- kiloton reduction in the electricity sector is still possible. This will be achieved by a combination of things like the Inuvik Wind Project, the LNG projects, Fort Providence Transmission Line, as well as assuming some of the 20 percent intermittent generation limit. Thank you, Mr. Speaker.