Thank you, Mr. Chair. So, Mr. Chair, I think perhaps I'm in a better place to answer the question now too.
There needs to be an update to the equipment on our side. So when the fibre loop that's coming in from the Yukon's side connects into our fibre, we'll need our systems to be brought up to speed in terms of -- I mean, the Mackenzie Valley Fibre Link -- or loop was now -- line, sorry, was built some years ago. This one's obviously newer and we'll need to ensure that we are up to date in our equipment so that the two can be seamless in their connection. Thank you.