Thank you, Mr. Speaker. I have a question for the Minister responsible for Energy, Mines and Petroleum Resources. It is in respect to N.W.T.P.C. Mr. Speaker, at some point in time the Minister did indicate that they were taking a study, or they completed their study, on bringing a power line around the lake and did not deem it to be feasible. They were considering possibly a cable line straight across the lake for the excess power that has been generated from Taltson as a result of the closure of Pine Point. Can the Minister indicate to me whether or not the study has been completed? Thank you.