Thank you, Mr. Chairman. I cannot verify those numbers but I can check them fairly quickly. I could perhaps have an answer on that after the break, in terms of the actual detail. One of the biggest problems, Mr. Chairman, was that the requirement for $3.9 million of additional funds for code upgrades, things like elevators and a new HVAC system, was a factor in considering the future of the Laing Building. Thank you.