Thank you, Mr. Chairman. The work plan, which is a preliminary work plan, was developed over a period of three years. What is required is an in-depth, on-site inspection, which would come up with some very hard costs as to the clean-up. Initially, the work plan has been developed for a three year period. The costs for next year are starting to be significant, so the expectation is that the liability question would be addressed sometime this year. Thank you.