Thank you, Mr. Speaker. Mr. Speaker, I do not know whether the means of transportation of the materials to build the facility is affecting the overall cost or not. I do know that the revised estimates include approximately $360,000 for the replacement of the ball diamond, which is something that we had considered because of the site on which the health centre was going to be built.
As far as the difference in the price between trucking it by road versus barging it, I do not have an answer for the Member on that. I could undertake to get one for him. Thank you.