I have another letter, Mr. Speaker. It is to the SAO in Tsiigehtchic with regard to water quality testing. It is a letter which is asking for a feasibility study which will take 12 months. They are looking for $12,000 to do the study.
David Krutko on Tabled Document 108-14(3): Letter To Tsiigehtchic Sao Re: Water Quality Testing
In the Legislative Assembly on February 22nd, 2001. See this statement in context.
Tabled Document 108-14(3): Letter To Tsiigehtchic Sao Re: Water Quality Testing
Item 14: Tabling Of Documents
February 21st, 2001
Page 1181
See context to find out what was said next.