Thank you, Mr. Speaker. I'd like to again ask the Minister responsible for the Deh Cho Bridge project, Mr. Handley, some questions. I draw his attention to two recent bridge projects in the territory that have been marred by cost overruns and a lack of pre-engineering. Willow Creek was supposed to cost $4.5 million, and ended up over $7 million. The river between Two Mountains Bridge was crushed by ice. No ice floe study was done prior to this bridge being put in. Is the Premier aware of these two bridge projects, and what will he do to ensure that these problems won't happen with the Deh Cho Bridge project?