Mr. Speaker, I'm generally aware of those two projects, two different situations. The Willow Creek Bridge goes back a number of years. There were some design problems with it. I expect that the Department of Transportation has learned from that. In terms of the other bridge where ice removed, it was a much smaller bridge but, again, one that we have concerns about, the inconsistent flow of water and ice in those small streams in that area. Mr. Speaker, the Deh Cho Bridge is a totally different kind of structure. It is a much larger bridge. It is one that the design is a very serious issue, and one that I assure the Member that we'll be as thorough as we possibly can in reviewing the design that is put forward by the Deh Cho Bridge Corporation. Thank you, Mr. Speaker.
Joe Handley on Question 138-15(3): Deh Cho Bridge Project Concerns
In the Legislative Assembly on May 26th, 2004. See this statement in context.
Return To Question 138-15(3): Deh Cho Bridge Project Concerns
Question 138-15(3): Deh Cho Bridge Project Concerns
Item 6: Oral Questions
May 25th, 2004
Page 546
See context to find out what was said next.