The Member is correct that there is a significant amount of upgrading and retrofit that's required in the school. Our report — I believe we're looking at the same report — confirms that. That information has been provided to the Department of Health.
In this case, we've had a situation where some material fell off the heating pipes. We haven't confirmed if it is asbestos as of yet. However, we have taken the precaution of having air quality testing done. We've taken the material and sent it south, and we're waiting for those results. We suspect that the material may contain some asbestos, but we have yet to confirm that.