No, the RFP has not been drafted. The answer to the second question is that the design criteria will be the GNWT design criteria with respect to energy management and energy efficiency, as we put a high priority on that. It won’t necessarily be an option; it will be a requirement, a minimum requirement that everybody will have to meet, and if you do well, then you’ll score better.