Mr. Chairman, as I indicated earlier, the plan is that Public Works is going to arrange for an engineer to go in and take
a look at Thomas Simpson or Bompas about what’s possible for a library space there. There is money available in the ’09 allocation, which I believe this year is $150,000 which is being held pending whatever plans may come out of the potential relocation of the library in Simpson. Thank you.