Thank you, Mr. Chair. I do appreciate your comments. The Member has raised the potential of a Peel River bridge on a number of different occasions. In terms of providing bridges where we have ferries right now, the first point I guess is that those are very expensive propositions. The Peel River bridge, our estimate is $70 million to
replace that. So that would be a significant challenge to overcome. There were a number of engineering, geotechnical and environmental studies done when the Dempster was being constructed, when the Mackenzie Valley Highway was being constructed at all of the ferry crossings. That’s been good background information as we move forward on the Deh Cho Bridge. It’s also being used to guide our discussions on the Peel River bridge. So we have taken a look at that and then we updated that to come up with the revised $70 million number. We’ve also taken a preliminary look at what the potential financing of that might be and that information has been shared with the Member. Thanks.