Mr. Speaker, again, if we put a bridge there, we wouldn’t have this problem. I think if the Minister put his emphasis on that, then we wouldn’t have to worry about the season, the rain. Again, this ferry operation is basically operated on the cable system. I believe the people that operate the ferry only have to have a Class 3 licence. You don’t need a Class 1. Again, it is a hydraulically operated ferry. There are no captains on this vessel. Again, it is a hydraulically operated system. I think that, if anything, we should do whatever we can to extend the season and make use of the operation. I know cost is a factor, but I think we are only talking a couple more weeks here. Thank you.
David Krutko on Question 120-16(4): Peel River Ferry Proposed Closure
In the Legislative Assembly on October 29th, 2009. See this statement in context.
Question 120-16(4): Peel River Ferry Proposed Closure
Oral Questions
October 28th, 2009
See context to find out what was said next.