INAC undertook site reconnaissance in 2009 and identified the tunnel and adjacent blast rock pile remains of a cabin and tent frames and an old beached wooden barge. INAC plans to undertake a
combined phase 1 and 2 environmental site assessment in the summer of 2010. Mr. Speaker, ENR will commit to obtaining the results of the site assessment and share them with the MLA for Tu Nedhe. Thank you.