Thank you, Mr. Speaker. Mr. Speaker, this is an issue that has been of great concern to the community and to the Member. We have taken a number of measures to come up with a plan to rectify the situation where the moisture in the cement flooring has caused some swelling of the covering that was placed on the floor. We have now gone back into the community and have come up with a plan with the contractor. Several tests were done and it was found that some of the vents were closed to allow the slab to dry and get some of the moisture out of the floor. We have ordered most of the material, most of it’s on site, and as soon as the floor is ready, we will come up and have the contractor in the community to rectify the situation. Thank you.
Michael McLeod on Question 47-16(5): Nahanni Butte Gymnasium Structural Deficiencies
In the Legislative Assembly on March 4th, 2010. See this statement in context.
Question 47-16(5): Nahanni Butte Gymnasium Structural Deficiencies