I didn’t hear an answer to the question there. If a department brings forward a proposal, there must have been some basis on which a decision is made to go on one side or the other. I didn’t hear an answer as to what basis that decision was made on.
I’d like to know also from the Premier, when this decision was being considered, was there an evaluation of the risk to the project, for instance, cost overruns, if the project went ahead to construction without approval of bridge design?