Thank you. The approach that the Power Corp has taken on this project on a number of areas was to minimize the costs. For example, after going out for our fee, the corporation chose a contractor to negotiate the price down, because the one portion, the construction portion was higher than anticipated, and they worked that number back down through an agreement in construction. There is also a portion of the contact that if there’s a savings on moving ahead on this project at lower than expected prices, that will reduce the overall impact, as well. So the
corporation has taken a number of steps to try to minimize the project.
One of the areas we find as the reason for the increase was at the initial stages, it was deemed an emergency. The first program that was put together wasn’t as detailed as was needed, and through the environmental process there was a number of factors that adjusted the plan that was initially designed. So the design had changed, and requirements had changed and that impacted the numbers upward. We’re hoping, now that we have the numbers established and set, that there may be even some savings achieved as we go forward with construction. Thank you.