Thank you, Mr. Chair. As part of the construction of the bridge, a wooden catwalk was constructed by the contractor. That was used during construction, and once construction was over, that was removed. As part of the design, we had considered installing a permanent metal catwalk under the bridge. After it was costed out, it was deemed too expensive, and we did not include that as part of the bridge. It would be nice for some types of inspections to get underneath, but we have what is called a snooper truck. It has a cantilevered arm boom on it that can drive along the surface of the road and have a cage that would have an individual to do inspections that can be in that cage and can go anywhere underneath the bridge and can see what is happening on the bridge. We don't actually need that permanent catwalk. Thank you, Mr. Chair.
Mr. Neudorf on Consideration in the Committee of the Whole of Bills and Other Matters
In the Legislative Assembly on June 23rd, 2016. See this statement in context.
Consideration in the Committee of the Whole of Bills and Other Matters
Consideration in Committee of the Whole of Bills and Other Matters
June 23rd, 2016
Neudorf
See context to find out what was said next.